Glossary
Energy and infrastructure, explained
Clear definitions, practical examples and technical distinctions across solar, power, construction and technology. Start with a term or explore a division.
140 terms
No matching terms. Try a broader word or select all divisions.
Renewable energy
Solar design, battery storage, EV charging and system performance.
-
AC-coupled vs DC-coupled battery
Compare AC- and DC-coupled battery systems, including conversion paths, retrofit compatibility, inverter limits and the separate requirements for backup.
Explore the term -
Battery augmentation
Battery augmentation adds energy, and sometimes power equipment, to storage already in service. Voltage, chemistry, listing, and the agreement set the limit.
Explore the term -
Battery energy storage system
Understand BESS components, battery power and capacity, backup limits, and what to assess before adding storage to a home or commercial solar system.
Explore the term -
Battery management system
Understand BMS functions, state-of-charge estimates and equipment coordination, with practical questions about battery and inverter compatibility.
Explore the term -
Battery power vs energy capacity
Kilowatts limit the load a battery can carry. Kilowatt-hours limit how long that output lasts, and a nameplate energy figure is not usable energy at the meter.
Explore the term -
Battery revenue stacking
Battery revenue stacking uses one battery for several grid or bill services, and the same stored kilowatt-hour cannot be committed twice at the same time.
Explore the term -
Battery round-trip efficiency
Calculate battery round-trip efficiency and learn why AC/DC boundaries, state of charge, auxiliaries and operating conditions change the comparison.
Explore the term -
Behind-the-meter solar
Behind-the-meter solar is generation on the customer side of the utility meter. It is not an export tariff. Maryland, Northern Virginia, and DC rules differ.
Explore the term -
DC fast charging
DC fast charging sends direct current from off-board equipment to the battery, unlike Level 2. Connectors, vehicle limits, and site power decide the session.
Explore the term -
DC to AC ratio
Learn how solar DC-to-AC ratio is calculated, why clipping can occur, and which equipment limits and energy assumptions must be reviewed separately.
Explore the term -
Demand response
How demand response differs from a demand charge, and what PJM versus BGE, Pepco Maryland, and Dominion contracts require as of November 2026.
Explore the term -
Depth of discharge
Learn how battery depth of discharge relates to state of charge, cycle depth and reserve, and why the capacity reference matters when comparing systems.
Explore the term -
Energy management system
See how a site energy management system coordinates loads, solar, storage, and the utility, and how it differs from a thermostat or grid control.
Explore the term -
EV charging load management
Understand static and dynamic EV load management, charging allocations, failure behavior and the site information needed to evaluate electrical capacity.
Explore the term -
EV charging make-ready infrastructure
EV charging make-ready is the electrical and civil work that lets chargers be added later. It is not the charger. See what owners should scope first.
Explore the term -
EV charging uptime
EV charging uptime is the share of time a port can deliver a session, not a status light. See what the federal rule counts and what it leaves out.
Explore the term -
EV fleet charging depot
An EV fleet charging depot charges many vehicles between trips. Dwell time, site power, and charging order differ from a public station or one workplace plug.
Explore the term -
Hosting capacity
Hosting capacity is the generation or load one feeder can accept before a utility limit is exceeded. The map screens a site; it is not interconnection approval.
Explore the term -
Hybrid solar inverter
What a hybrid solar inverter does beyond a PV-only unit, how AC and DC coupling differ, and what product listing and utility review each decide.
Explore the term -
Interval electricity data
Interval electricity data records use on a repeating step, not a monthly total. Learn what a 15-minute or hourly file can and cannot show before storage sizing.
Explore the term -
Level 1 vs Level 2 charging
Compare 120-volt Level 1 charging with 208- and 240-volt Level 2 charging, including dwell time, vehicle limits, and Maryland, Virginia, and DC rules.
Explore the term -
Load shifting
Learn how load shifting changes when electricity is used, how it differs from peak shaving, and why operational flexibility and tariff assumptions matter.
Explore the term -
Microgrid
Learn what defines a microgrid, how resources and loads are coordinated, and why resilience depends on operating priorities, controls and system design.
Explore the term -
NACS vs CCS charging
NACS and CCS1 are vehicle inlets. SAE J3400 hardware, adapters, and the federal connector rule still sit beside charger-network protocols in November 2026.
Explore the term -
Open Charge Point Protocol
OCPP is the message set between an EV charger and its management system, not the vehicle plug or the site electrical service. Versions still have to match.
Explore the term -
P50 vs P90 solar yield
P50 and P90 are exceedance estimates of modeled solar energy. See what each figure includes, which period it covers, and why one expected total can mislead.
Explore the term -
Peak shaving
Learn how peak shaving controls grid demand, why battery power and duration matter, and which tariff and load data a business needs to assess savings.
Explore the term -
Point of interconnection
Learn what a point of interconnection defines, how it can differ from metering and ownership boundaries, and why those interfaces matter for solar projects.
Explore the term -
Smart EV charging
Smart EV charging controls when or how fast a vehicle draws power. Networking alone is not control. See what changes for capacity, tariffs, and project scope.
Explore the term -
Solar arc fault
A solar arc fault can start a fire. See how series and parallel arcs differ, what a detector does, and which records to give a qualified person.
Explore the term -
Solar asset management
Ongoing technical and commercial oversight of an operating solar plant, distinct from construction closeout and from a monitoring screen alone.
Explore the term -
Solar availability
Solar availability is a time or energy ratio with named hours, equipment, and exclusions. See how that definition changes a monthly performance report.
Explore the term -
Solar capacity factor
Calculate solar capacity factor, compare AC and DC denominators, and understand why weather, output boundaries and time periods affect the result.
Explore the term -
Solar carport
Understand solar carports, how parking and structural constraints affect design, and what to consider when combining a canopy with EV charging.
Explore the term -
Solar commissioning
Learn what solar commissioning verifies, how it differs from inspection and utility approval, and which records owners need before accepting a system.
Explore the term -
Solar curtailment
Solar curtailment is output held below what a healthy plant could produce. See how transmission limits, prices, export caps, and reliability orders differ.
Explore the term -
Solar data acquisition system
What a solar data acquisition system records, why a portal gap is not a fault, and which sensors and network choices belong in the specification.
Explore the term -
Solar EPC
Learn what solar EPC includes, how design and construction responsibilities are divided, and what developers should clarify before comparing proposals.
Explore the term -
Solar export limitation
Solar export limitation caps power a system sends onto the utility at a meter or interconnection point, apart from nameplate, site use, and curtailment.
Explore the term -
Solar feasibility study
See what a solar feasibility study should evaluate, from site and generation assumptions to connection risks, electricity use and the investment decision.
Explore the term -
Solar ground fault
A solar ground fault sends array current to ground or metal. What the alarm means, why the array stays hazardous in daylight, and when an owner should stop.
Explore the term -
Solar I-V curve testing
Solar I-V curve testing compares a measured string curve with sun and temperature at the test. See what the shape can suggest and what it cannot prove.
Explore the term -
Solar interconnection study
Understand what solar interconnection studies evaluate, why capacity and operating assumptions matter, and which approvals remain separate from the study.
Explore the term -
Solar lease vs PPA
A solar lease bills for equipment use. A PPA bills for delivered energy. Compare ownership, contract controls, and the rules that vary by state.
Explore the term -
Solar performance guarantee
A solar performance guarantee compares measured plant energy with a weather-adjusted model. See what the clause does not promise and which lines to read.
Explore the term -
Solar performance ratio
Understand solar performance ratio, calculate an illustrative PR, and learn why irradiation data, measurement boundaries and reporting methods matter.
Explore the term -
Solar pile testing
Solar pile testing measures how one ground-mount pile moves under static tension, compression, or lateral load. One result does not map the rest of the site.
Explore the term -
Solar power purchase agreement
Learn how an on-site solar PPA works, how it differs from ownership or leasing, and which pricing, property and environmental-attribute terms to review.
Explore the term -
Solar preventive vs corrective maintenance
Solar preventive vs corrective maintenance splits scheduled inspection that corrects wear from repair after a fault or shortfall. Site and warranty set timing.
Explore the term -
Solar procurement RFP
See what a solar procurement RFP asks bidders to price or exclude, including design, equipment, interconnection, roof work, and storage, so bids are comparable.
Explore the term -
Solar rapid shutdown
What solar rapid shutdown controls on a building, how it differs from a disconnect, and why Maryland, Virginia, and DC may use different editions.
Explore the term -
Solar repowering
Learn how solar repowering differs from a module swap, an inverter retrofit, and a capacity change that can reopen a utility interconnection review.
Explore the term -
Solar shading analysis
Solar shading analysis separates horizon shade, nearby shadows, and electrical mismatch. The result is site-specific and is not a roof approval.
Explore the term -
Solar single-line diagram
What a solar single-line diagram shows for a photovoltaic project, how it differs from a three-line or wiring drawing, and which gaps send a sheet back.
Explore the term -
Solar string mismatch
Solar string mismatch is extra power lost when series modules or parallel strings cannot each run at their own maximum. How to separate shade from faults.
Explore the term -
Solar thermography
Solar thermography maps heat patterns on operating PV modules. Learn what an infrared image can show, what it cannot prove, and what to confirm before a survey.
Explore the term -
String inverter vs microinverter
Compare solar inverter layouts, shading behavior, monitoring, maintenance and storage compatibility before choosing a complete system for your roof.
Explore the term -
Usable battery capacity
Usable battery capacity is the energy a battery delivers under its stated limits, distinct from nameplate energy, efficiency, temperature, and warranty duty.
Explore the term
Power infrastructure
Substations, electrical studies, protection and distribution equipment.
-
Air-insulated vs gas-insulated substation
Compare air-insulated and gas-insulated substations on enclosure, land, SF6 stewardship, and the studies a qualified engineer must still judge.
Explore the term -
Arc flash study
See what an arc flash study estimates, which OSHA duties apply, which changes make the results obsolete, and why a qualified person still judges the equipment.
Explore the term -
Automatic transfer switch
How an automatic transfer switch chooses a source, and why open transition, closed transition, and a bypass are separate decisions for a facility.
Explore the term -
Circuit breaker interrupting rating
A circuit breaker interrupting rating is a tested device limit at a stated voltage, not the site's fault current and not an assembly short-circuit rating.
Explore the term -
Dry-type vs liquid-filled transformer
Compare dry-type and liquid-filled transformers on cooling, fluid rules, maintenance, and replacement fit. A qualified professional must assess the site.
Explore the term -
Electrical as-built drawings
Electrical as-built drawings mark field changes. See how they differ from design, shop, and record sets, and what a PDF cannot prove about hidden conductors.
Explore the term -
Electrical commissioning
Electrical commissioning checks that installed power equipment meets the design and owner requirements before energization, unlike a factory test or a startup.
Explore the term -
Electrical energization plan
An electrical energization plan settles sequence ownership, holds, backfeed paths, and who may close before any equipment is placed in service.
Explore the term -
Electrical load calculation
Learn what an electrical load calculation establishes, why breaker totals are misleading, and how proposed equipment affects service and feeder planning.
Explore the term -
Electrical service upgrade
Learn what an electrical service upgrade can involve, how it differs from panel replacement, and why load assessment and utility coordination come first.
Explore the term -
Electrical substation
Understand what electrical substations do, how their components work together, and what owners should establish before a new installation or upgrade.
Explore the term -
Electrical thermographic inspection
What an electrical thermographic inspection records on energized gear, why that image is not a repair or a temperature limit, and what the file should hold.
Explore the term -
Factory acceptance vs site acceptance test
Factory acceptance checks equipment before shipment. Site acceptance checks the installation. See what each witness can show and which records to keep.
Explore the term -
Grounding and bonding
Understand grounding, bonding and fault-current paths, why a ground rod alone is insufficient, and what owners should document during electrical changes.
Explore the term -
Load flow study
Learn what load flow studies model, which data and operating cases they need, and how their results differ from load calculations and fault studies.
Explore the term -
Lockout tagout
Lockout tagout is an employer's hazardous-energy program, not a method for equipment. How owners and contractors divide outages, records, and control.
Explore the term -
Medium-voltage switchgear
Learn what medium-voltage switchgear does, how ratings and protection fit together, and which interfaces to resolve before equipment procurement.
Explore the term -
Metal-clad vs metal-enclosed switchgear
Metal-clad versus metal-enclosed switchgear is an IEEE construction comparison, not a site selection. See what a specification must still name.
Explore the term -
Operational technology cybersecurity
How operational technology cybersecurity differs from office-network security, and which questions to ask before a remote connection to control equipment.
Explore the term -
Planned electrical outage
A planned electrical outage is a scheduled interruption of a defined boundary. See who may authorize the window and what that approval does not prove.
Explore the term -
Power factor correction
Power factor correction supplies reactive power near inductive loads. The utility clause, a harmonic study, and the switching plan are separate decisions.
Explore the term -
Power quality study
A power quality study separates utility events, facility loads, and wiring. Learn what a voltage-sag record shows and what the meter file cannot decide.
Explore the term -
Power transformer vs distribution transformer
Power and distribution transformers differ by circuit duty, IEEE product standards, and the DOE efficiency rule. One capacity figure does not assign the class.
Explore the term -
Protection coordination study
Understand how protection coordination studies evaluate device response, which system data they need, and why settings require separate verification.
Explore the term -
Protective relay
A protective relay detects a fault and initiates a trip or alarm. It does not open the circuit. Studies, codes, and maintenance duties stay site-specific.
Explore the term -
Relay injection testing
Relay injection testing shows one relay, the included wiring, and the trip path left connected. A pass does not prove the settings file or device coordination.
Explore the term -
SCADA
SCADA is supervisory control and data acquisition. Learn what the host, the path, and the field device each do, and why a screen does not prove protection.
Explore the term -
Short-circuit current rating
What a short-circuit current rating covers, how it differs from a breaker interrupting rating, and what the label does not prove about site fault current.
Explore the term -
Short-circuit study
Learn what short-circuit studies calculate, which inputs influence fault current, and how equipment-duty results connect to protection and design decisions.
Explore the term -
Substation automation
How substation automation measures, decides, and operates on site, and why a remote screen supervises rather than replacing that local decision.
Explore the term -
Substation commissioning
Understand equipment and integrated testing, document control, energization readiness and handover responsibilities in a substation commissioning scope.
Explore the term -
Substation design-build
How substation design-build assigns design and construction to one party, which decisions stay with the owner, and how that differs from design-bid-build.
Explore the term -
Substation grounding grid
How soil, fault current, and clearing time shape step and touch exposure around a substation grounding grid, and which questions a site study must answer.
Explore the term -
Substation retrofit
A substation retrofit changes equipment in a station that stays in service. As-builts, outage windows, fault duty, and clearance decide the work.
Explore the term -
Switchgear vs switchboard
How switchgear and a switchboard differ in construction, device standards, and ratings, and which markings a bid must name before equipment is priced.
Explore the term -
Transformer dissolved gas analysis
Dissolved gas analysis measures gases in transformer insulating liquid. See what a sample can show, what it cannot decide, and what scope should still confirm.
Explore the term -
Transformer kVA sizing
Understand transformer kVA, single- and three-phase relationships, and the load, environmental and protection factors a complete sizing decision requires.
Explore the term -
Underground power distribution
How underground power distribution changes duct-bank ownership, repair access, and one-call duties for commercial sites in Maryland, Virginia, and DC.
Explore the term -
Uninterruptible power supply
How an uninterruptible power supply uses stored energy for selected loads, and how that differs from a generator, a transfer switch, and a power rating.
Explore the term
Construction & roofing
Roof assessment, building materials and project delivery.
-
ADA renovation requirements
ADA renovation requirements use three tests: altered elements, a primary function area, and path of travel. A passed permit is not that federal analysis.
Explore the term -
Adaptive reuse
Adaptive reuse gives an existing building a new purpose. In Maryland, Virginia, and DC, a new use can be a change of occupancy: structure, egress, and systems.
Explore the term -
Asphalt shingles
Asphalt shingles shed water in overlapping courses. Architectural and three-tab names do not set wind class, remaining life, or how a solar mount attaches.
Explore the term -
Building automation system
A building automation system supervises connected equipment. Learn which fire-alarm, meter, and relay work a renovation proposal should keep outside that scope.
Explore the term -
Building commissioning
Building commissioning checks systems against written owner requirements. Learn how it differs from retro-commissioning and from a one-day startup.
Explore the term -
Commercial roof inspection
Learn what commercial roof inspections can reveal, what visual checks cannot establish, and which report details help owners plan repairs and maintenance.
Explore the term -
Commercial roof maintenance plan
A commercial roof maintenance plan is an inspection and repair file, not a remaining-life forecast. A qualified professional must assess the actual roof.
Explore the term -
Construction allowance vs contingency
See who controls a construction allowance versus a contingency, what each leaves uncovered, and how to compare bids without treating either as a cost cap.
Explore the term -
Construction change order
A construction change order states the changed work and any shift in price or time. See why a directive and an unpriced field fix are not the same.
Explore the term -
Construction closeout
Construction closeout separates substantial completion, the punch list, record documents, training, and final payment. Each decision needs its own evidence.
Explore the term -
Construction procurement lead time
Construction procurement lead time is three separate clocks: submittal, fabrication, and delivery. A catalog week-count is not a promise for this order.
Explore the term -
Construction quality assurance vs quality control
Owners use quality assurance to check the builder's control of the work. Quality control is the builder's own system. An inspection report is not acceptance.
Explore the term -
Construction scope of work
A construction scope of work sets inclusions, exclusions, and trade lines a price covers, and how that differs from drawings, allowances, and qualifications.
Explore the term -
Design-build vs design-bid-build
Compare construction delivery methods, contractual responsibilities, scope maturity and owner decisions before choosing an approach for your project.
Explore the term -
Firestopping
Firestopping protects a rated wall or floor at a penetration with a tested system, not a generic sealant. The adopted code and listing control the match.
Explore the term -
General contractor vs construction manager
Compare who holds the trade contracts, who advises before a construction price exists, and why the job title does not assign design responsibility.
Explore the term -
Guaranteed maximum price
A guaranteed maximum price caps cost plus fee. Allowances, assumptions, and owner changes can still move it. It is not a lump sum or uncapped cost-plus.
Explore the term -
MEP coordination
MEP coordination fits mechanical, electrical, and plumbing routes before fabrication and shows what a clash does not decide about code or structure.
Explore the term -
Occupied building renovation
Learn how occupied renovations coordinate work zones, utilities, access, air quality and handback so the construction plan reflects building operations.
Explore the term -
Preconstruction services
Understand preconstruction deliverables, estimate assumptions, procurement dependencies and the owner decisions needed before major construction begins.
Explore the term -
Roof drainage
Slope, primary drains, and overflow are separate roof-drainage decisions. A solar layout can block a path the drawings still show. Confirm the edition locally.
Explore the term -
Roof flashing
Roof flashing turns water back at walls, chimneys, pipes, and solar penetrations. Step flashing, counterflashing, and a boot are different pieces.
Explore the term -
Roof insulation R-value
Roof insulation R-value is a layer test, not the assembly U-factor or a solar substitute. Maryland, Virginia, and DC do not share one prescriptive number.
Explore the term -
Roof moisture survey
Understand what roof moisture surveys investigate, how thermal and leak-detection methods differ, and what evidence supports restoration or replacement.
Explore the term -
Roof restoration vs replacement
Compare roof restoration, recover and replacement using condition, moisture and scope evidence, with questions to ask before accepting a roofing proposal.
Explore the term -
Roof structural assessment
Learn what a roof structural assessment examines, how it differs from a roof inspection, and why solar loads need a building-specific engineering review.
Explore the term -
Roof uplift resistance
Roof uplift resistance is a wind-load question for the whole roof assembly and any solar attachment. A brochure rating is not the site calculation.
Explore the term -
Standing seam metal roof
A standing seam metal roof hides its clips in a raised joint. Seam type and clip movement are not the same question as a solar attachment on the actual roof.
Explore the term -
Tenant improvement
How a tenant improvement finishes a shell, who owns the work, what a landlord allowance leaves out, and why the permit and access path stay separate.
Explore the term -
TPO vs EPDM vs PVC roofing
Compare TPO, EPDM and PVC membranes by system design, seams, exposure and maintenance, with practical questions for evaluating complete roofing proposals.
Explore the term -
Value engineering
Value engineering compares a required function with cost, then records a named owner decision. It is not an unordered substitution or a silent scope cut.
Explore the term
Technology infrastructure
Cabling, networking, cloud systems and cybersecurity.
-
Cable certification vs cable testing
Understand verification, qualification and cabling certification, including test boundaries, report identifiers and the evidence needed at handover.
Explore the term -
Cat6 vs Cat6A
Compare Cat6 and Cat6A for office networks, including 10GBASE-T support, channel limits, installation considerations and the testing evidence to request.
Explore the term -
Cloud migration assessment
Learn how a cloud migration assessment evaluates workloads, dependencies, readiness and costs to create an actionable migration and remediation plan.
Explore the term -
Hybrid cloud
Understand hybrid cloud, its links between local and cloud systems, and the networking, security, cost and recovery decisions an architecture must address.
Explore the term -
Network segmentation
Learn how network segmentation controls communication, why VLANs alone are insufficient, and how to define and test useful security boundaries.
Explore the term -
OTDR testing
Understand how OTDR testing locates fiber events, why setup and dead zones matter, and how traces complement end-to-end insertion-loss measurements.
Explore the term -
Recovery time vs recovery point objective
Understand recovery time and recovery point objectives, compare them with a timeline example, and learn how to test recovery against business needs.
Explore the term -
Single-mode vs multimode fiber
Compare single-mode and multimode fiber by application, distance, optics and test requirements, with practical guidance for specifying a complete link.
Explore the term -
Structured cabling
Learn how structured cabling connects a building, where copper and fiber fit, and which testing and handover records make an installation useful.
Explore the term -
Vulnerability assessment vs penetration testing
Compare security assessments and penetration tests by purpose, scope, evidence and limitations, with questions for evaluating proposals and follow-up work.
Explore the term -
Wireless site survey
Learn how predictive, passive and active Wi-Fi surveys support design, why coverage differs from capacity, and what useful survey reports should include.
Explore the term -
Zero-trust architecture
Learn how zero-trust architecture evaluates access, how identity and enforcement fit together, and why implementation requires more than a security product.
Explore the term
Looking for local project guidance? Explore our solar guides or contact Soleil Energy.